L Shape Dormer Conversion, Waltham Abbey

Concept were able to create a L shape conversion which added a master bedroom, walk in wardrobe & ensuite. We also split a bedroom on the first floor to a smaller bedroom and a bathroom as the only bathroom in the property was on the ground floor. Having a ground floor bathroom meant that it…

Read More

L shaped Dormer Conversion, Waltham Abbey

Concept were able to create a L shape conversion which added a master bedroom, walk in wardrobe & ensuite. This property had an existing velux conversion that had been carried out several years before which had to be ripped out including the old steel beams due to not meeting today’s building regulations, which the clients…

Read More

L Shaped Dormer, Waltham Abbey

Concept created a beautiful l shape conversion on this victorian property which added 2 bedrooms including an ensuite to the master bedroom. This was the first time we installed a glazed dormer cheek which was part of our design which left 2 very happy customers. The project was finished to a high standard, and dormer…

Read More

Full Rear Dormer Conversion, Waltham Abbey, Edward Court

This property was an exceptionally large footprint so the client was thinking about going for a velux conversion, after our first consultation they received our floor plans and quotes for both options & decided that the full dormer was the one for them, and they were so happy they did. Due to having a large…

Read More

Full Rear Dormer Conversion, Waltham Abbey Deer Park Way

This project was undertaken late 2017. This was a truss roof conversion which created a new master bedroom, office & ensuite. These house types have the stairwell at the front of the property so to place the new loft stairs above the existing stairs were not an option,  so to find room for the new…

Read More

Full Rear Dormer Conversion, Waltham Abbey Crooked Mile Way

This project was completed early 2017. The conversion added a spacious master bedroom & ensuite that was a wet room style with fixed shower screen. We also fitted feature LED lighting to the niche in the shower area. The clients then added fitted wardrobes. This project took 4 weeks to complete.

Read More